WizdoBee
Built for KHDA · ADEK · SPEA inspection standardsElementary to High SchoolAny curriculumEnglish and ArabicPilot places open for 2027

KHDA · ADEK · SPEA

Built for UAE private schools

KHDA in Dubai, ADEK in Abu Dhabi, and SPEA in Sharjah. Each requirement below sits next to what WizdoBee does about it. "In the demo" means you can try it today.

406,563students in Dubai private schools in 2026–27, up 4.6%
13,000+students of determination in Abu Dhabi private schools in 2024, up from about 6,000 in 2023
24 hoursmaximum notice before a KHDA quality visit in 2026–27
6UAE inspection standards shared by KHDA, ADEK, and SPEA

Context about UAE schools, not WizdoBee results. Sources are listed on the For UAE schools page.

Regulators

Requirement by requirement

Dubai Inclusive Education Policy Framework (2017), Revised Categorization Framework for Students of Determination (2019) and KHDA quality assurance visits, 2026–27.

RequirementWhat WizdoBee doesStatus
2026–27 visits focus on the academic progress of students of determination and on specialist support for complex needs.Progress on each IEP goal is measured from the student's real classwork and homework, per student and per group.In the demo
Schools get a maximum of 24 hours' notice before a visit.An evidence pack per student and per inspection standard, plus a full activity log, is available on any day.In the demo
Arabic teaching and learning is one of four 2026–27 focus areas.Arabic tasks carry the same supports as other subjects, and family pages work in Arabic.In the demo
Exam access arrangements must reflect the student's normal way of working.Every accommodation a student uses is logged with dates, documenting their normal way of working.In the demo
Students of determination are recorded under KHDA's 2019 categories.Passport needs map to the KHDA categories, so the register matches what KHDA expects.Planned for pilot
IEPs are reviewed with the team around the student, commonly three times a year.Review dates, goal progress, and tutor and therapist notes are collected before each meeting.In the demo

Requirements are summarized from public sources as of November 2026. Schools should confirm details with KHDA, ADEK, or SPEA.

Inspection

Evidence under the six UAE inspection standards

KHDA, ADEK, and SPEA all inspect against the UAE School Inspection Framework. WizdoBee files evidence under each standard as students work.

1. Students' achievementProgress per student and per group, measured from real work.
2. Personal and social developmentWellbeing alerts, independence, and how-it-felt check-ins after each task.
3. Teaching and assessmentThree versions of each task, live class groups, and rubric feedback teachers approve.
4. CurriculumEvery adaptation comes from the school's own curriculum and required materials.
5. Protection, care, guidance, and supportLearner Passports, IEPs, supports logged per task, and concerns routed to named staff.
6. Leadership and managementA live register, an evidence pack per standard, governor summaries, and a full activity log.

Data and privacy

Student information is sensitive, especially for students of determination. Here is what is built in today and what will be in place before any real student data is used.

Access by role: students see only their work, parents only their child, staff only their studentsBuilt in
Families decide who sees diagnoses, the Passport, and reportsBuilt in
Students never see diagnoses or level labelsBuilt in
Every view, message, and change loggedBuilt in
Never sold, no ads, not used to train outside AI modelsOur promise
Student data hosted in the UAEBefore launch
Individual school logins with Google or Microsoft accountsBefore launch
Independent security audit (SOC 2 Type 2)Before launch
UAE data protection legal reviewBefore launch
Pilot

The pilot

We're recruiting UAE private schools for a pilot. An independent evaluator compares pilot classes with similar classes that don't use WizdoBee, over one school year, and the results will be published.

  1. TalkA 30-minute walkthrough
  2. AgreeClasses, goals, and terms
  3. Set upPassports and training
  4. TeachOne school year
  5. EvaluateIndependent results
What the evaluation measuresHow it's measured
Tasks finishedShare of homework and classwork completed by students of determination.
Work done independentlyShare of tasks completed without adult help, from in-app data.
IEP goal progressGoals met or on track at each review, compared with the previous year.
Teacher timeMinutes per week spent making differentiated versions, from teacher logs.
Student confidenceA short termly survey in pilot and comparison classes.
Plans

Start with a pilot. Grow to the whole school.

Schools pay per student, per year, for all of WizdoBee.

Pilot

One school year

For schools that want to see results first

  • Selected classes in one division
  • Setup and training for teachers and the inclusion team
  • Learner Passports for students on your register
  • Independent evaluation, with results shared with you
  • Pilot terms agreed with your school
Ask about the pilot
Most schools

Whole school

Per student, per year

Everything, for every class and every family

  • Elementary, Middle, and High School
  • Every role: students, teachers, inclusion team, LSAs, families, tutors, and leaders
  • Reading, math, times tables, portfolio, and music built in
  • Evidence packs for KHDA, ADEK, or SPEA
  • Family pages in English and Arabic
Get a quote

School group

Per student, per year

For groups running several schools

  • Everything in Whole school
  • One curriculum set up once for every campus
  • Inclusion reporting across schools (planned)
  • A named partner for rollout and training
  • Data hosted in the UAE (before launch)
Talk to us
Book a demo